辽宁石油化工大学学报

辽宁石油化工大学学报 ›› 2010, Vol. 30 ›› Issue (2): 29-31.DOI: 10.3696/j.issn.1672-6952.2010.02.009

• 化工机械 • 上一篇    下一篇

埋地热油管道启输投油时间的确定

顾锦彤,马贵阳*   

  1. 辽宁石油化工大学石油天然气工程学院,辽宁抚顺113001
  • 收稿日期:2009-04-12 出版日期:2010-06-25 发布日期:2017-07-05
  • 作者简介:顾锦彤(1972-),女,江苏启东市,讲师,硕士。

Determination of the Time for Oil on Buried Hot Oil Pipelines  in the Course of Starting Transportation

GU Jin-tongMA Gui-yang*   

  1. College of Petroleum Engineering, Liaoning Shihua University,Fushun Liaoning 113001, P.R.China
  • Received:2009-04-12 Published:2010-06-25 Online:2017-07-05

摘要: 采用有限单元法对埋地热油管道启输投油时管道周围的土壤温度场进行数值计算,利用计算结果确
定投油时间。算例结果表明,预热20h后开始投油,符合预热要求,与工程实际相符合。该技术的应用为热油管道
经济、安全投产提供了可靠的理论依据。

关键词: 埋地热油管道 ,  , 土壤温度场 , 数值计算 ,  , 启输 , 投油时间

Abstract:  

Using finite element method, the soil temperature field around the buried hot oil pipeline during starting transportation was calculated numerically. Then the time for oil was identified precisely. The results show that 20 h after preheating for oil can be in line with the requirement. The results are in accordance with engineering. A reliable theoretical basis is provided for hot oil pipeline to operate economically and securely through applying the technology.

Key words: Underground hot oil pipelines , Soil temperature field , Numerical calculation , Starting transportation , Time for oil

引用本文

顾锦彤,马贵阳. 埋地热油管道启输投油时间的确定[J]. 辽宁石油化工大学学报, 2010, 30(2): 29-31.

GU Jin-tong,MA Gui-yang. Determination of the Time for Oil on Buried Hot Oil Pipelines  in the Course of Starting Transportation[J]. Journal of Liaoning Petrochemical University, 2010, 30(2): 29-31.

使用本文

0
    /   /   推荐

导出引用管理器 EndNote|Ris|BibTeX

链接本文: https://journal.lnpu.edu.cn/CN/10.3696/j.issn.1672-6952.2010.02.009

               https://journal.lnpu.edu.cn/CN/Y2010/V30/I2/29