辽宁石油化工大学学报

辽宁石油化工大学学报 ›› 2016, Vol. 36 ›› Issue (3): 63-66.DOI: 10.3969/j.issn.1672-6952.2016.03.015

• 计算机与控制 • 上一篇    下一篇

多资源约束下批量拆卸优化方法

郭希旺1,张 威1,葛琳琳1,胡承波2   

  1. (1.辽宁石油化工大学计算机与通信工程学院,辽宁抚顺113001;2.沈阳化工大学经济与管理学院,辽宁沈阳110142)
  • 收稿日期:2016-02-14 修回日期:2016-05-30 出版日期:2016-06-25 发布日期:2016-07-01
  • 作者简介:郭希旺(1981-),男,博士,讲师,从事智能优化算法、绿色再制造等方面的研究;E-mail:x.w.guo@163.com。
  • 基金资助:
    抚顺市科学技术发展资金计划项目(FSKJHT201548);大学生创新创业资助项目(201410148060,201510148068)

Optimal Method of Lot Sizing Disassembly with Multi-Resource Constraints

Guo Xiwang1 Zhang Wei1, Ge Linlin1, Hu Chengbo2   

  1. 1.School of Computer and Communication EngineeringLiaoning Shihua University, Fushun Liaoning 113001, China; 2.School of Economics & ManagementShenyang University of Chemical Technology, Shenyang Liaoning 110142, China

  • Received:2016-02-14 Revised:2016-05-30 Published:2016-06-25 Online:2016-07-01

摘要: 拆卸建模和规划对废旧产品的回收和再利用具有重要意义,目前的拆卸方法很少关注多资源约束对拆卸问题的影响。根据批量拆卸优化问题的特点,建立了多资源约束下以拆卸获得收益最大为优化目标的批量拆卸优化问题的数学模型,采用CPLEX软件对多资源约束下批量拆卸优化问题进行求解。为了验证该模型在求解此类批量拆卸优化问题的有效性,采用多组随机算例的仿真实验对其验证,结果表明该模型求解此类问题有效。

关键词: 环境意识, 多资源约束, 选择性拆卸, 优化方法

Abstract:

Disassembly modeling and planning are meaningful for the reuse and recycling of obsolete and discarded products. However, the existing disassembly methods pay little or no attention to impact of resources constraints for disassembly problem. According to the characteristics of lot sizing disassembly optimization problem with multiresource constraints, a mathematical model was established to solve disassembly optimization problems with multi-resource capacity constraints. The model aims at maximizing the profit of disassembly. The CPLEX software is used to solve the model. In order to approve the effectiveness of the proposed model, several randomly generated problem instances are used, the experimental results approved the effectiveness of the proposed model for the lot sizing disassembly optimization problem.

Key words: Environment conscious, Multi-resource constraints, Selective disassembly, Optimal method

引用本文

郭希旺,张 威,葛琳琳,胡承波. 多资源约束下批量拆卸优化方法[J]. 辽宁石油化工大学学报, 2016, 36(3): 63-66.

Guo Xiwang, Zhang Wei, Ge Linlin, Hu Chengbo.

Optimal Method of Lot Sizing Disassembly with Multi-Resource Constraints[J]. Journal of Liaoning Petrochemical University, 2016, 36(3): 63-66.

使用本文

0
    /   /   推荐

导出引用管理器 EndNote|Ris|BibTeX

链接本文: https://journal.lnpu.edu.cn/CN/10.3969/j.issn.1672-6952.2016.03.015

               https://journal.lnpu.edu.cn/CN/Y2016/V36/I3/63