The Optimization for Grouting Hole of Concrete-Filled Steel Tubular Stent
Zhao Long, Zhang Deqi
Concrete-filled steel tubular stent which owns good mechanical properties and good economic benefit has been a new the roadway supporting materials. However, grouting hole cracked in some use, weakening the support performance seriously. Numerical simulation is applied to analyze the structure of the stent that has cracked, finding cracking is mainly due to stress concentration of the hole edge, and determining the preferred position of grouting hole, it can reduce the probability of cracking on grouting holes radically, ensuring the stability of concrete-filled steel tubular stent, and the analysis has general applicability, the application of Xinzhi further demonstrates the rationality of this method.
|
|