1 |
胡宗琴,蒋龙军,刘大永.川西海相三高深井完井测试难点及对策[J].油气井测试,2016,25(2):54⁃56.
|
|
HU Z Q,JIANG L J,LIU D Y.Difficulties and countermeasures in completion test of three high deep Wells in western Sichuan Marine Facies[J].Well Testing,2016,25(2):54⁃56.
|
2 |
苏镖, 赵祚培, 杨永华. 高温高压高含硫气井完井试气工艺技术与应用[J]. 天然气工业, 2010, 30(12): 53⁃56.
|
|
SU B, ZHAO Z P, YANG Y H. Completion and well testing technology in HTHP and high⁃HS gas wells of the eastern Sichuan Basin[J]. Natural Gas Industry, 2010, 30(12): 53⁃56.
|
3 |
苏镖,龙刚,许小强,等.超深高温高压高含硫气井的安全完井投产技术——以四川盆地元坝气田为例[J].天然气工业, 2014,34(7):60⁃64.
|
|
SU B,LONG G,XU X Q,et al.Safe completion and production technologies of a gas well with ultra depth, high temperature, high pressure and high H2S content: A case from the Yuanba Gas Field in the Sichuan Basin[J].Natural Gas Industry,2014,34(7):60⁃64.
|
4 |
刘殷韬,雷有为,曹言光,等.普光气田大湾区块高含硫水平井完井管柱优化设计[J].天然气工业,2012,32(12):71⁃74.
|
|
LIU Y T,LEI Y W,CAO Y G,et al.An optimal design of pipe strings for horizontal sour gas wells at the Dawan block, Puguang gas field[J].Natural Gas Industry,2012,32(12):71⁃74.
|
5 |
张晓东,陈龙.基于冲蚀磨损理论的压裂滑套导流角度数研究[J].中国科技论文,2018,13(22):2586⁃2591.
|
|
ZHANG X D,CHEN L.Research on the flow conduction angle of fracturing slide sleeve based on the erosion wear theory[J].China Sciencepaper,2018,13(22):2586⁃2591.
|
6 |
董刚,张九渊.固体粒子冲蚀磨损研究进展[J].材料科学与工程学报,2003,21(2):307⁃312.
|
|
DONG G,ZHANG J Y.Developments of reserch on the solid particle erosion of materials[J].Journal of Materials Science and Engineering,2003,21(2):307⁃312.
|
7 |
董云龙,唐世忠,牛艳花,等.水平井套管固井滑套分段压裂完井存在问题及对策[J].石油钻采工艺,2013,35(1):28⁃30.
|
|
DONG Y L,TANG S Z,NIU Y H,et al.Problems and measurements of sliding sleeve staged fracturing completion in casing cementing horizontal wells[J].Oil Drilling & Production Technology,2013,35(1):28⁃30.
|
8 |
张炜烽,樊洪海,查永进,等.大规模体积压裂情况下套管弯曲力计算方法[J].石油机械,2015,43(12):29⁃32.
|
|
ZHANG W F,FAN H H,ZHA Y J,et al.A recommended calculating method for casing bending force after large scale volume fracturing[J].China Petroleum Machinery,2015,43(12):29⁃32.
|
9 |
LORWONGNGAM A,WRIGHT S,HARI S,et al.Using multidisci⁃plinary data gathering to evaluate extreme limited entry completion design and improve perforation cluster efficiency[C]//SPE/AAPG/SEG Unconventional Resources Technology Conference.Calgary:SPE,2020:URTEC⁃2020⁃2796⁃MS.
|
10 |
丁宇奇,兰乘宇,刘巨保,等.分层压裂管柱冲蚀特性数值模拟与实验分析[J].石油钻采工艺,2017,39(2):231⁃236.
|
|
DING Y Q,LAN C Y,LIU J B,et al.Numerical simulation and experimental analysis of separate layer fracturing string erosion properties[J].Oil Drilling & Production Technology,2017,39(2):231⁃236.
|
11 |
刘洪涛,沈新普,刘爽,等.高温高压气井多封隔器管柱完整性分析方法及应用实例[J].天然气工业,2020,40(7):83⁃89.
|
|
LIU H T,SHEN X P,LIU S,et al.Integrity analysis method of multi⁃packer string in HTHP gas wells and its application cases[J].Natural Gas Industry,2020,40(7):83⁃89.
|
12 |
张智,冯潇霄,向世林.高温高产气井冲蚀对油管柱结构完整性的影响[J].中国科技论文,2022,17(1):31⁃38.
|
|
ZHANG Z,FENG X X,XIANG S L.Influence of high temperature and high yield gas well erosion on structural integrity of oil string[J].China Sciencepaper,2022,17(1):31⁃38.
|
13 |
王汉,李玉飞,蒲俊余,等.多封隔器完井管柱优化研究[J].钻采工艺,2020,43(S1):8⁃11.
|
|
WANG H,LI Y F,PU J Y,et al.Study on multi⁃packer completion string optimization[J].Drilling & Production Technology,2020,43(S1):8⁃11.
|
14 |
朱玉杰,郭朝辉,魏辽,等.套管固井分段压裂滑套关键技术分析[J].石油机械,2013,41(8):102⁃106.
|
|
ZHU Y J,GUO C H,WEI L,et al.Analysis of key technology of casing cementing staged fracture sliding sleeve[J].China Petroleum Machinery,2013,41(8):102⁃106.
|
15 |
ROBERTS G,LILLY T B,TYMONS T R.Improved well stimulation through the application of downhole video analytics[C]//SPE Hydraulic Fracturing Technology Conference and Exhibition. Calgary:SPE,2018:SPE⁃189851⁃MS.
|
16 |
彭齐,杨雄文,任海涛,等.扇形齿PDC钻头破岩机理及工作性能仿真分析[J].石油机械,2023,51(7):25⁃35.
|
|
PENG Q,YANG X W,REN H T,et al.Simulation analysis of rock breaking mechanism and working performanceof PDC Bit with fan⁃shaped cutter[J].China Petroleum Machinery,2023,51(7):25⁃35.
|